On day two of our time here in Ny-Alesund we have been making good progress. Much of the morning was taken up with further administration, covering both firearms training and coordination of the testing plans and media coverage of the activities taking place here at the NERC base. We did get time to conduct a small amount of testing or the response of two of our three metal detectors with meteorite surrogates, and the initial results were looking promising. We also undertook a significant amount of indoor vibration testing, which the system dealt with better than we had expected; this produced so much banging and crashing that the BBC Radio 4 Today team became curious of what was going on and stopped by for a brief interview.

When we resumed testing in the afternoon we experienced some difficulties in integrating the three detectors. It took a few hours but we managed to make the necessary software tweaks to get the hardware to behave properly. As we reach the end of the day we are at the stage where all three detectors are operational, and we have some initial configuration for outdoor testing of the system.

Tomorrow morning (Sunday) we intend to go out into the field to set up the test site, and all being well (after some further minor tweaks tomorrow afternoon) we should be heading out for some initial detector testing on Monday morning.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s